Cone crusher mantle and concave spare parts supply factory
Installation and commissioning
● Pre-installation inspection: Check the dimensional accuracy and surface quality of the crushing wall to ensure that there are no defects such as cracks, wear, and deformation, and prepare the tools and materials required for installation.
● Correct installation: According to the requirements of the equipment manual, the crushing wall is correctly installed on the moving cone and the fixed cone, and fastened with special bolts or other fixing devices to ensure a firm installation.
● Commissioning and operation: After the installation is completed, perform no-load commissioning to check the operation of the crushing wall, including whether there is abnormal vibration, noise, etc.
Operation and use
● Uniform feeding: Through equipment such as vibrating feeders, the stone to be crushed is evenly fed into the feed port of the cone crusher to avoid segregation and concentrated feeding.
● Control the feed particle size: Strictly control the feed particle size, not exceeding the maximum particle size allowed by the design of the cone crusher, to prevent excessively large particles from entering the crushing chamber and causing blockage or damage to the crushing wall.
● Monitor operating parameters: During the operation of the equipment, closely monitor parameters such as current, voltage, oil temperature, oil pressure, and the working status of the crushing wall.
Product display



Maintenance
● Regular inspection: Regularly stop the machine to check the wear of the crushing wall, including the degree of wear and whether there are cracks, so as to find problems in time and take measures.
● Timely replacement: When the crushing wall is worn to a certain extent, affecting the crushing effect and production efficiency, a new crushing wall should be replaced in time.
● Cleaning and lubrication: Keep the surface of the crushing wall clean to prevent dust and impurities from accumulating and affecting heat dissipation and crushing effects. At the same time, lubricate each lubrication point of the crusher according to the prescribed cycle and requirements.
Safety precautions
● Protective device: During the operation of the crusher, it is strictly forbidden to open the protective door or perform any maintenance operations to prevent accidents.
● Cleaning materials: Before cleaning the crushing chamber or replacing the crushing wall, the power supply must be cut off and the crusher must be completely stopped. At the same time, appropriate safety measures must be taken to prevent sudden falls of materials and cause injuries.
● Training before taking up the post: Operators must undergo professional training, be familiar with the operating procedures and safety precautions of the cone crusher, and operate in strict accordance with the operating procedures.